ⓘ Wallace Roof Project

Work will be performed on Wallace roof from May 12 through August. During this time, the south A-level doors will be closed and used for emergency exit only. We ask that patrons enter Wallace through the SHED or North (Quarter-mile) entrance.

Black Deaf Student Data-Postsecondary Achievement

This 2019 report compiles data re: Black Deaf Students achievement in postsecondary schools. Read this Inside Higher Education article "Building Up the Black Deaf Student Community" . There is an InfoGuide with Black Deaf community resources. A bibliography of selected works is available. 

Add new comment

Chat with a Librarian