ⓘ Wallace Roof Project

Work will be performed on Wallace roof from May 12 through August. During this time, the south A-level doors will be closed and used for emergency exit only. We ask that patrons enter Wallace through the SHED or North (Quarter-mile) entrance.

December 2022 Newsletter

Here is the December newsletter link. https://acrobat.adobe.com/link/review?uri=urn:aaid:scds:US:51ec70ad-2fd8-482b-92a9-6358b2da1c33

Take a peek of a snippet of the newsletter below. Open the link for the full newsletter view and to open links within the newsletter.
A newsletter that shows a cartoon of Joan Naturale, NTID Librarian in left hand corner and and RIT logo in the right hand corner with the phrase "Check it out" in the middle. Info about TRIPOD, an NTID archive collection and other news

Add new comment

Chat with a Librarian